Berikut ini adalah data berita acara (BA) dan nilai konsinyasi yang telah ditetapkan untuk mereka:
73 (Rp 2.817.944.000), 108 (Rp 2.689.864.000), 549 (Rp 2.043.887.000), 363 (Rp 475.122.000), 389 (Rp 7.920.918.000), 389 A: (Rp 3.227.832.000), 389 B: (Rp 3.227.832.000), 510 (Rp 1.049.463.000), 63 (Rp 4.439.733.000), 255 A (Rp 1.004.987.000), 457 M (Rp 55.413.000), 64 (Rp 1.638.239.000), 65 (Rp 65.877.000), 242 (Rp 155.265.000), 255 C (Rp 355.580.000), 296 (Rp 169.266.000), 252(Rp 3.641.385.000), 253 (Rp 1.143.914.000), 258 (Rp 1.024.372.000), 4819 (Rp 88.636.920.000), 483 A (Rp 357.906.000), 484 (Rp 2,468,381,000), 485 (Rp 382.188.000), 486 (Rp 814.623.000), 487 A (Rp 932.486.000), 488 A (Rp 1.017.199.000), 489 A (Rp 2.969.297.000), 465 A (Rp 663.612.000), 465 B (Rp 206.894.000), 38 (Rp 4.785.116.000), 483 (Rp 755.780.000), 487 (Rp 292.641.000), 488 (Rp 68.031.000), 489 (Rp 2.945.347.000), 465 (Rp 297.424.000), 371 (Rp 9.752.393.000), 75 (Rp 17.735.716.000), 85 (Rp 23.576.000), 358 (Rp 2.802.217.000), 543 (Rp 2.110.561.000), 449 (Rp 3.160.941.000), Total: Rp 177.860.229.381
Sumber: BPN Kota Depok.